“Harnessing the Wind” Construction

The construction portfolio of “Harnessing the Wind” consists of 21 – 6 1/2” x 10” color digital photographs, printed on 8 1/2” x 11” Hahnemuhle Photo Rag Bright White 301 gsm smooth paper on an Epson 7890 printer using Epson’s Ultrachrome K3 inkset. I made five behind the scenes visits to document the construction of two utility grade commercial wind energy projects in the United States. The photographs were created between 2012 and 2014, printed by myself in Eureka, Nevada in November of 2015.

22_101311220

A large hole is excavated for the base of the wind turbine. Since this wind farm was built on Bureau of Land Management land, BLM archeologist contractors oversee the excavation watching for archeological artifacts. The painted diagram on the first layer of concrete is a template for the rebar. Pattern Energy’s Spring Valley Wind, Nevada.

23_101311043

Rebar is put into place. A crane moves the rebar for the workers to assemble. Pattern Energy’s Spring Valley Wind, Nevada.

24_101311329

Once the rebar is put into place, workers build the concrete forms. Pattern Energy’s Spring Valley Wind, Nevada.

25_101311003

Workers pour concrete over the rebar contained by the forms. Pattern Energy’s Spring Valley Wind, Nevada.

26_101311297

Ground wires are placed over the finished concrete base. It is now ready for backfilling with earth. Pattern Energy’s Spring Valley Wind, Nevada.

27_042712034

Once the backfilling is complete, cranes built on site erect the tower. Pattern Energy’s Spring Valley Wind, Nevada.

28_140618483

A painter prepares the surface on a tower section prior to assembly. Pattern Energy’s Panhandle 2 Wind, Texas.

29_140619229

Tower sections are assembled by site built cranes. Pattern Energy’s Panhandle 2 Wind, Texas.

30_042712416

A nacelle is lifted off the truck trailer and prepped for lift. Pattern Energy’s Spring Valley Wind, Nevada.

31_042712075

A worker atop the tower awaits the arrival of the nacelle. Pattern Energy’s Spring Valley Wind, Nevada.

32_042712325

Two workers place a lift strap around a blade in preparation for assembly to the hub. Pattern Energy’s Spring Valley Wind, Nevada.

33_042712300

The blade is lifted by crane for assembly to the hub. Pattern Energy’s Spring Valley Wind, Nevada.

35_042712308

Workers maneuver the blade for proper alignment to the hub. Pattern Energy’s Spring Valley Wind, Nevada.

36_042712117

Workers hook up the blade assembly to the crane. Pattern Energy’s Spring Valley Wind, Nevada.

37_140618459

A site built crane begins to lift the blade and hub assembly to the nacelle. Pattern Energy’s Panhandle 2 Wind, Texas.

38_042712173

Hub and blade assembly lift. Pattern Energy’s Spring Valley Wind, Nevada.

39_042712186

The crane positions the blade and hub assembly for attachment to the nacelle. Pattern Energy’s Spring Valley Wind, Nevada.

40_140619535

A worker attaches the blade and hub assembly. Pattern Energy’s Panhandle 2 Wind, Texas.

41_042712512

An electrical substation is built on site to connect to the power grid. Pattern Energy’s Spring Valley Wind, Nevada.

42_130620016

Power transmission lines carry power from the wind farm to the electrical grid. Pattern Energy’s Ocotillo Wind, California.

Here is a link to the “Harnessing the Wind” portfolio.

Special thanks to NV Energy, Pattern Energy and Mortenson Construction for their generous contributions that helped to make this portfolio possible!